Glenlyon Pedestrian Bridge

GlenlyonPedestrianBridge

Gladstone,QLD

Sector

Civil & Infrastructure

Subsector

Roadworks & Bridges

Client

Gladstone Regional Council

Completed

2011

icons

$400K

Project value

icons

18

Weeks to build

height

34m

Length span

icons

22

Tonnes

The new Glenlyon Pedestrian Bridge in Gladstone has provided a much needed new safety-link for pedestrians and cyclists crossing the Tigalee Creek between Philip Street and Dixon Drive roundabouts.

Prefabricated off-site and installed by Hutchies, the 22 tonne bridge spans more than 34 metres and is just over 3 metres wide to accommodate both cycle and pedestrian traffic together in both directions.

Glenlyon Pedestrian Bridge

Roadworks & Bridges

#Find out more about this project