![](/generated/320w-3-2/hb-ci-glenlyonpedbridge-3-lowres-jpg.jpg?1697782168)
![Glenlyon Pedestrian Bridge](/generated/1920w-16-9/hb-ci-glenlyonpedbridge-1-lowres-jpg.jpg?1697782169)
GlenlyonPedestrianBridge
Gladstone,QLD
$400K
Project value
18
Weeks to build
34m
Length span
22
Tonnes
The new Glenlyon Pedestrian Bridge in Gladstone has provided a much needed new safety-link for pedestrians and cyclists crossing the Tigalee Creek between Philip Street and Dixon Drive roundabouts.
Prefabricated off-site and installed by Hutchies, the 22 tonne bridge spans more than 34 metres and is just over 3 metres wide to accommodate both cycle and pedestrian traffic together in both directions.
![](/generated/1920w-16-9/hb-ci-glenlyonpedbridge-2-lowres-jpg.jpg?1697782169)
![](/generated/720w-4-3/hb-ci-glenlyonpedbridge-4-lowres-jpg.jpg?1697782173)
![](/generated/720w-3-4/hb-ci-glenlyonpedbridge-3-lowres-jpg.jpg?1697616056)
![](/generated/720w-4-3/hb-ci-glenlyonpedbridge-5-lowres-jpg.jpg?1697782173)
![](/generated/1920w-16-9/hb-ci-glenlyonpedbridge-6-lowres-jpg.jpg?1697782175)
![](/generated/320w-3-2/hb-ci-glenlyonpedbridge-3-lowres-jpg.jpg?1697782168)