Blacktown Mental Health Recovery Centre

BlacktownMentalHealthRecoveryCentre

Blacktown,NSW

Sector

Health

Client

Health Infrastructure NSW

Completed

2024

Team Leader

Andrew Rowland

Project Manager

Johnstaff Projects

Architect

NBRS Architecture

Civil & Structural Engineer

Northrop

Electrical Engineer

Stantec

Mechanical Engineer

Steensen Varming

Hydraulic Engineer

Arup

Lift Consultant

Steensen Varming

Fire Consultant

Arup

Building Certifier

Blackett Maguire + Goldsmith

Quantity Surveyor

Altus Group

Photographer

Alexander Mayes

icons

$36M

Project value

icons

80

Weeks to build

icons-1

44

Beds

The Blacktown Mental Health Recovery Centre is a purpose-built facility designed to deliver contemporary models of forensic mental health care. Developed under the Statewide Mental Health Infrastructure Program (SWMHIP), the centre replaces the existing Bunya Unit at Cumberland Hospital and relocates it to the Blacktown Hospital campus.

The new three-storey, 44-bed centre includes 24 medium secure forensic beds and 20 low secure beds, expanding capacity to meet regional demand. The facility is designed to support recovery-focused care, encouraging independence and participation in therapeutic activities. It integrates seamlessly with general health services at Blacktown Hospital and features wellness architecture and landscape design that promote healing and connection to nature.

The centre’s façade, inspired by native red gum and lilli pilli trees, and its civic entry plaza with oversized angular window boxes, reflect a commitment to transparency, vibrancy, and community engagement.

Blacktown Mental Health Recovery Centre

Health